SAMAGRA THE
SOLAGRO is our mission that combines the activities of Solar PV
System and Organic Agricultural Activities. It is our aim to
implement 25,000 MW solar PV systems. It needs 1,50,000/- Acres of
land. Leave such a huge volume of land idle, after the
implementation of Solar PV system, is not at all advisable so
we
have designed Organic Agricultural activities in the same land.
This ensures the maximum utility of
land.
VARUNA THE JALA
SAMRUDDHI
VARUNA THE
JALA SMRUDDHI is the part of our project which envisages bringing
800 Million Québec Metres of pure drinkable water into the main
land. For the house hold needs of India we need
750 X 120 crore litres of water that is 90,000 Quebec Metre thus we
are capable of providing water for the house hold and industrial
and agricultural needs of our nation. Floryghat Power envisages the
implementation of 16 Five Lakh Million Litre per Day capacity Multy
Stage Flash sea water desalination plants in the costs of our
nation. Out of the total 16, we are planning 4 in Morbi 4 in Surat
2 in Kumta 2 in Thiruchentur 3 in Machilipatinam and 1 in
Mandarmani. The Generation of 7680 MW (80% of 16 X 600 MW)
electricity
from MSF plants and 4250 MW (17% 0f 25000 MW) of electricity from
SPV system is the most important aspect of our projects. As part of
our effort to do organic agricultural activities we have planned to
do
cow farming also.
Our
Capability
We are
strongly backed with the funding panel of our
International Investment Consortium on the funding requirement
for
the implementation of our projects. We have a team of
professionally
capable and dedicated volunteers for the mission to be
lead.
SAMAGRA ONE
UNIT
Land
:
30
Acres
SPV Array
:
05 MW
Mounting Structure *
Inverters* Transformers
Agricultural
accessories * Irrigation system
Land : 1500
Acres
SPV array : 250
MW
30000 Tons of
vegetable and herbal cultivation
Average Generation per
day = 1164384 units
Employment
Opportunity
Electrical Engineers: 2
Numbers
Diploma holders: 10
Nos
ITI Certificate Holders : 20
Nos
Un skilled manual labors : 500
Nos
50
unit = 1 cluster, 100 cluster forms the total project in 7
years.